Project
Reference: Lismore & Kookhan Substations
Client: Transgrid
Objective: Perimeter Fence Upgrade - approximately 1300 lineal metres
Summary: Specified as Palisade Fencing with Razorwire Topping
BFH Sydcon won the Tender using it's innovative ZEDfence™ Design re-engineered for Terrain Category 2.5 Wind Speeds