(02) 9971 8621
  (02) 9971 8631
Unit 7 / 176 South Creek Road
Cromer NSW 2097

ActewAGL, Canberra

Project Reference:    Building D    
Client:                    actewAGL
Objective:               Perimeter Fence Upgrade 
  
Summary:   

  • Non-invasive drilling techniques adopted due to significant underground services.
  • Design, Manufacture and Installation of ZEDframe™ with Triple Pointed Palisade.
  • 3.0m high in Hot Dipped Galvanised Finish.
  • Installation of Gates with facility for electric locking.
  • The Client is now able to install additional electronic security surveillance around the perimeter by utilising the fence framework as the carriageway, without disturbing existing underground services. 

 
ZEDfence™......it might look like just another palisade fence from the outside, but it's what's on the inside that makes it unique.


Our innovative LINK
rail™, facilitating continuity of services when required, and future-proofing the site....


.........and in turn adding architectural appeal to an otherwise industrial finish.
 



Integrated Gates are blended into the fence and latch points lowered to reduce climbability. 



LINKrail™ eliminates potential climb points and provides continuity of anti-climb topping. 

Our Unique patented framing system is attracting a lot of attention from specifiers and decision makers, as well as our competitors it would seem.

ZED
fence
™ is the framework of the future. Please call our office for further information on the latest innovative product to enter the Australian market. Why construct a fence with a singular capability when you can install our ZEDframe™...........    
   
Copyright © 2006 BFH Sydcon Pty Ltd