Lismore & Grafton Substations, Transgrid
Client: Transgrid
Objective: Perimeter Fence Upgrade 1300 lineal metres
Summary:
- Design and Construct Contract
- Undertake Site Survey
- Demolish and Removal of Existing Chainwire Fence
- Civil works - Carpark construction including 300m2 of bituminous asphalting
- Supply and Installation of 3.0m INFINITY Palisade Security Fence
- Supply and Install 550 dia Razorwire Anti-Climb Topping
- Manufacture, Supply and Installation of 3 Vehicular Double Leaf Hinged Gates
- Manufacture, Supply and Installation of 2 Automated Cantilever Sliding Gate with Access Control
- Engineer, Supply and Installation of 1300w x 300d Reinforced Concrete Strip Footing & Anti-Dig plinth.
- Project Management and documentation including As Builts, Site Surveys and OH&S Safety Statistics.
- Project completed by BFH Sydcon within the designated timeframe.